top of page

projects

Vasto Civil supports civil construction projects across British Columbia, including site servicing, roadworks, utilities, parks, and community infrastructure.
67f53e_fc793e50080a4859a5b317ac73f1e6d9~mv2.avif
road-construction-workers.jpg

Roadworks

Sustainability at Vasto Civil is integrated into each decision we make — from early planning and material selection to construction methods and long-term maintenance. We focus on reducing environmental impact, protecting natural systems, and creating spaces that support resilient communities.

sakhalin-russia-12-november-2014-construction-gas-pipeline-ground.jpg

On/Off-site Utilities

Sustainability at Vasto Civil is integrated into each decision we make — from early planning and material selection to construction methods and long-term maintenance. 

67f53e_ff2203e6e76748b0a2640d063c245418~mv2.avif
Untitled.png
Urban Construction Scene

Parks and Fields

Sustainability at Vasto Civil is integrated into each decision we make — from early planning and material selection to construction methods and long-term maintenance. We focus on reducing environmental impact, protecting natural systems, and creating spaces that support resilient communities.

Construction Bulldozer Work

Earthworks

Sustainability at Vasto Civil is integrated into each decision we make — from early planning and material selection to construction methods and long-term maintenance. 

1200px-Translink_Port_Coquitlam_Station-a.jpg

8899 Sprites Townhouse Development

Richmond, BC

Vasto Civil managed the full Civil and Landscape scopes for this 28-unit residential development in Richmond, BC. The project integrates critical municipal utility connections, public road upgrades, and high-quality site finishing. Scheduled for completion in 2026.

    • Roadworks 

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Site Finishes

    Installation of concrete curbs, planter walls, and gravel strips.

    Green Space

    Execution of tree protection measures and installation of sod lawns.

    Amenities

    Installation of key site fixtures like bike racks, benches, and playground equipment.

  • Integration

    Managed the seamless integration of civil, utility, roadway, and landscape disciplines.

    Compliance

    Delivered all scopes consistent with high-quality standards and City of Richmond requirements.

    Coordination

    Exemplifies successful coordinated municipal infrastructure delivery.

599 Madore Townhouse Development

Coquitlam, BC

Vasto Civil is leading the full multidisciplinary design and delivery of the civil, geotechnical, and landscape scopes for this 25-unit townhouse development in Coquitlam, BC. This project highlights our expertise in managing complex challenges on a steep, service-constrained site, utilizing progressive design-build methods to achieve municipal compliance, design efficiency, and cost planning.

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Site Challenges

    Project situated on a steep, service-constrained site, requiring specialized solutions.

    Geotechnical

    Critical works include shotcrete shoring and foundation design.

    Civil Design

    Full design and delivery of utility servicing for water, storm, and sanitary networks, including an underground stormwater detention system.

  • Delivery Model

    Exemplifies Vasto's capability in integrated design-build delivery and technical coordination.

    Sustainability

    Focus on sustainable infrastructure planning and demonstrating environmental responsibility.

    Compliance

    Achieves strong alignment with municipal standards while showcasing design efficiency and cost planning.

South Nanaimo HEARTH

South Nanaimo, BC

Vasto Civil is leading the preparation and infrastructure servicing for BC Housing’s HEART program in Nanaimo. This project focuses on rapid site grading, utility installation, and roadworks to create a safe, functional environment for temporary housing residents while ensuring full coordination with program requirements.

    • Roadworks 

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Accessible Design

    Delivered low-maintenance outdoor spaces combining sod, trees, and swales to enhance the living environment.

    Modular Features

    Installed reusable hardscape elements, including benches, shade sails, and picnic areas, designed to support the temporary nature of the development.

  • Integrated Civil Works

    Managed full utility installation (water, storm, sanitary) alongside robust surface works for roads and pedestrian areas.

    Environmental Protection

    Integrated erosion and sediment control (ESC) measures to protect the surrounding environment during the construction phase.

    Technical Coordination

    Demonstrated expertise in aligning infrastructure, accessibility, and aesthetic quality within a specific social housing framework.

West Coast Express (Translink) Facility Rehabilitation Project

Various West Coast Express stations across Metro Vancouver, including Port Coquitlam, Maple Meadows, Coquitlam Central, Mission City, Port Moody, and Port Haney 

Vasto Civil led the large-scale renewal of multiple commuter rail stations across Metro Vancouver, including Port Coquitlam, Coquitlam Central, Port Moody, and others. The project focused on enhancing the safety, accessibility, and longevity of key transit hubs through comprehensive concrete rehabilitation, asphalt reconstruction, and drainage upgrades within active operational environments.

    • Roadworks 

    • Earthworks 

  • Concrete Renewal

    Replaced and rehabilitated platforms, walkways, and parking areas using durable cast-in-place Portland cement, rapid-set concrete, and precast pavers.

    Asphalt & Curb Works

    Executed selective patching, full-depth reconstruction, and parking lot overlays, complemented by the repair and replacement of reinforced concrete curbs and new line markings.

    Structural Stability

    Performed critical subgrade preparation, drainage upgrades, and re-leveling of walkways to ensure passenger comfort and long-term facility durability.

  • Operational Integration

    Demonstrated the capability to manage complex construction practices within active public transportation environments without disrupting transit schedules.

    Environmental Responsibility

    Maintained strict erosion and sediment control (ESC) measures throughout the multi-site project to ensure full compliance with sustainability standards.

    Infrastructure Excellence

    Showcased expertise in large-scale civil renewal and integrated utility improvements across various municipal jurisdictions.

Westridge Ave Residence 

West Vancouver, BC 

Vasto Civil managed the new construction of a luxury single-family dwelling on a challenging cliffside property overlooking English Bay. Facing a steep elevation change of over 35 feet, the project required precise grading, shoring, and slope stabilization to deliver a high-quality residence that exceeds area standards.

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Cliffside Stabilization

    Implemented precise grading, shoring, and slope stabilization measures to manage the site’s significant 35-foot elevation drop.

     

    Structural Foundations

    Managed all site earthworks and foundation works, including the coordination of modular and prefabricated structural elements.

     

    Landscape Finishing

    Delivered complete landscape finishing to integrate the luxury dwelling into its unique coastal environment.

  • Adaptive Management

    Successfully navigated technical challenges and limited site access through meticulous coordination and adaptability to unforeseen conditions.

     

    Efficiency & Control

    Delivered the project on time and within budget through effective cost control and streamlined construction management.

    Exceptional Quality

    Achieved a level of craftsmanship and structural integrity that surpasses local luxury standards for the region.

Maywood ParkSelf-Cleaning Washroom

Burnaby, BC

Vasto Civil provided comprehensive civil and landscape works to support the installation of a fully automated self-cleaning washroom for the City of Burnaby. The project involved intricate utility connections and the construction of engineered foundations to accommodate the prefabricated unit while ensuring seamless integration into the active park environment.

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Park Reinstatement

    Restored hard and soft surfaces, including concrete paving, pathways, and turf, to match the existing park aesthetic.

    Aesthetic Continuity

    Performed specialized planting and landscaping to integrate the new structure naturally into the surrounding park environment.

    Accessibility & Drainage

    Focused on creating accessible pathways and efficient drainage systems to ensure a safe and functional facility for the public.

  • Precision Utility Integration

    Installed underground connections for storm, sanitary, water, power, and data services in strict accordance with municipal standards.

    Structural Integrity

    Completed engineered concrete slab foundations designed for the long-term durability of the prefabricated washroom unit.

    Operational Sensitivity

    Executed all works under tight spatial constraints and environmental requirements, ensuring minimal disruption to daily public park operations.

Seton Villa

Burnaby, BC

Vasto Civil completed civil and landscape modifications to support the installation of a new electrical substation, emergency generator, and mechanical HVAC unit at Seton Villa. The project focused on integrating critical infrastructure through secure enclosures and functional access paths while ensuring the protection of the existing site environment.

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Secure Enclosures

    Constructed engineered concrete pads, walls, and gates to provide secure housing for the new substation and generator units.

    Civil Works

    Executed precise excavation, trenching, backfilling, and site grading to accommodate new mechanical and electrical systems.

    Functional Access

    Provided paved areas and curbs to ensure seamless vehicular and pedestrian circulation around the facility.

  • Landscape Integration

    Restored shrubs and lawns and applied gravel surfacing around equipment pads to blend the new infrastructure with existing site features.

    Tree Protection

    Performed all trenching activities under arborist supervision to ensure the health and safety of existing trees.

    Functional Balance

    Successfully balanced the installation of heavy functional infrastructure with meticulous site restoration and aesthetic considerations.

Burnaby Animal Shelter – Progressive Design-Build

Burnaby, BC

Vasto is leading the civil and landscape planning for the Burnaby Animal Shelter, a progressive design-build project currently in the design and pre-construction phase. The work encompasses site analysis, demolition planning, and utility servicing, focusing on sustainable site integration and regulatory compliance for this municipal facility.

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Specialized Animal Spaces

    Integrated dog runs, catio spaces, and covered livestock zones into the landscape design.

    Cohesive Park Features

    Included planting, turf, and hardscaping to ensure functional, accessible, and aesthetically consistent exterior areas.

     

    Optimized Layouts

    Planned the layout of parking and exterior animal areas to maximize site functionality.

  • Pre-Construction Leadership

    Managing site analysis, grading, slope strategies, and utility servicing during the initial design phase.

    Environmental & Drainage Focus

    Coordinating civil and landscape works to minimize environmental impact and optimize drainage systems.

    Regulatory Alignment

    Ensuring full compliance with City of Burnaby standards through meticulous planning and stakeholder engagement.

McKenna Place

Burnaby, BC

Vasto Civil undertook extensive civil and landscape works at McKenna Place to support drainage improvements and exterior building enhancements. The project involved a comprehensive site regrading of roads and playground areas to mitigate pooling and ensure safe, accessible conditions for all residents and visitors.

    • Roadworks 

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Drainage Mitigation

    Executed precise site regrading and earthworks to achieve positive drainage, effectively resolving previous water pooling issues.

    Structural Hardscapes

    Installed precast concrete stairs, replaced segmented retaining walls, and repaved driveways with high-quality asphalt.

    Utility Support

    Managed excavation and backfilling for new electrical and stormwater systems, including perimeter drains and underground utilities.

  • Site Reinstatement

    Restored disturbed areas with sod and native plantings to enhance the site's natural aesthetics post-construction.

    Upgraded Enclosures

    Improved site functionality by upgrading fencing and garbage enclosures to align with the new site improvements.

     

    Seamless Integration

    Coordinated all grading and hardscape installations to comply with municipal standards while integrating seamlessly with the existing building footprint.

Station 265 Madeira Park Renovation

Madeira Park, BC

Vasto Civil executed comprehensive renovations at Station 265 to support structural and utility improvements. The project focused on critical earthworks and drainage coordination around the Ambulance Bay, ensuring operational stability and preventing water pooling through advanced perimeter drainage and infrastructure upgrades.

    • On/Off-site Utilities 

    • Parks and Fields 

    • Earthworks 

  • Drainage & Filtration

    Installed perimeter stormwater drainage and an oil interceptor, with full connections to existing sanitary and storm networks.

    Structural Concrete

    Removed and replaced existing slabs and reinforced footings to support new slab-on-grade areas and structural footings.

    Circulation Surfaces

    Resurfaced asphalt in parking and driveway areas and provided temporary shoring to maintain stability during deep excavation.

  • Operational Readiness

    Executed all trenching, backfilling, and concrete encasement works to project specifications, ensuring the station remained functional.

    Water Management

    Carefully coordinated site grading and earthworks to achieve proper drainage and protect the Ambulance Bay from water accumulation.

    Environmental Restoration

    Complemented the civil scope with surface grading to restore lawns and planting beds, integrating functional upgrades with cohesive aesthetic improvements.

bottom of page